Skip to content

Our process

Prep, Prime, Paint, Protect.

Every QRP job runs through these four stages in this order. We don't shortcut them, even on a fast rental turnover.

Our process

Prep is most of the job.
Paint is the easy bit.

Buildings fail at the prep, not the topcoat. Four steps, no shortcuts, same on a $4k bedroom refresh as on a $40k exterior or commercial repaint.

i

Walk-through & scope

On-site assessment, substrate notes, colour direction, fixed-price quote within 3 business days.

ii

Prep protocol

Wash, scrape, fill, sand, prime. Non-negotiable: every surface gets the same discipline.

iii

Application

Two coats premium Dulux or Haymes spec'd for the substrate. Cut-ins by hand, rolled or sprayed to spec.

iv

Handover & warranty

Walk-through with you, touch-up kit, photo record, 5-year written warranty transferable on sale.

  • 01

    Prep

    • Pressure wash + sugar-soap clean on every exterior; vacuum + microfibre on every interior
    • Sand back peeling, chalking, or glossed surfaces back to a sound substrate
    • Scrape and fill cracks, nail holes, hairline movement; spot-prime exposed timber and metal
    • Mask windows, fixtures, floors; remove or cover hardware
    • Document substrate condition with photos for QA + warranty record
  • 02

    Prime

    • Substrate-matched primer: oil-based on knotty timber, alkali-resistant on render, stain-block on smoke or tannin
    • Adhesion test on glossy or aged substrates
    • Two coats of primer over patched zones for a flat colour base
    • Always 24 hours cure before recoating
  • 03

    Paint

    • Premium Dulux or Haymes system specified for the substrate and climate exposure
    • Two-coat minimum on every surface, three coats on high-traffic enamels
    • Brushed cut-ins for crisp lines; rollers on broad walls; spray only where the finish requires it
    • Wet-on-wet edges, no lap marks, no roller stipple
  • 04

    Protect

    • Daily clean-down; rooms left usable each evening
    • Hardware re-mounted, fixtures returned, floor protection removed without residue
    • Final walk-through with client, defect list resolved before invoice
    • Written warranty card and touch-up paint can supplied on completion
    • Five-year workmanship warranty, transferable on sale

Get a quote

Want this kind of process on your home?

Get a quote. One business day response.